Modular
Blast Room With Full Recovery Floor
Our client manufactures children’s play equipment
predominantly for municipal play areas. When were called to attend
a meeting at their factory it was explained that they already had
a blast room however the method of grit recovery, Vacuum waffle
floor, was unreliable and regularly caused problems with production.
The client was searching for a new blast room that would offer a
more reliable method of grit recovery with improved ventilation
and lighting.
| |
| Location
of Proposed unit |
Internal |
| Units
Working Hours per Day |
Two
shifts of 8 hours 5 days per week |
| Internal
Dimensions |
8mt
long, 4mt wide & 3mt high |
Airblast proposed a modular facility incorporating
bogie and rails for product handling. The facility was to incorporate
a full recovery floor to eliminate time spent on manually recovering
abrasive and reverse jet dust extraction. Installation took 3 weeks.
| |
| Facility
Type |
Modular |
| Weather
Proof |
No |
| Internal
Dimensions |
8mt
long, 4mt wide & 3mt high |
| Grit
Recovery |
Full floor scrapper recovery |
| Number
of Blasters |
Two |
| Dust
Extraction |
Reverse
Jet |
More
information on all the products mentioned in this case study could
be found at Blast Rooms.
|